|
Sheboygan Press Article 3/1/08 - Please take
note that the interview with Bob Kampmann never
discussed anything about a high capacity well at
the mine site. Neither Bob Kampmann, nor
the groundwater study by RSV Engineering
mentioned the subject at all. The problem
identified by the study, and discussed in the
interview, relates to how the natural
groundwater divide (barrier) between Crystal Lake
and the mine has been artificially altered by
mineral extraction and excavation at the site.
The reclamation plan as proposed would likely
increase the rate and scope of harm to Crystal
Lake by altering the divide further.
|
|